SG044 Hunstanton signalling instructions 1909
NEW SEPTEMBER 2014. Instruction No. 514 issued by the GER on 29 January 1909 to lay down signalling regulations at Hunstanton station. The headings are Electric Train Tablet Working; Electric Rail Contact in Single Line ahead of Up Advanced Starting Signal; "Open" and "Shut Points" Levers; and Shunting on Main Lines - Passenger Train Vehicles, and Goods and Mixed Trains. There is no layout diagram included.
The document comprises a single sheet. The original was much bigger than A4, but if it is reduced in size to fit on to an A4 sheet the printing is small but still just about readable. To achieve this, set the 'Page Scaling' on the Print... page to 'Fit to Printable Area'.
This file will be available to download as soon as payment has been made. You go to your account and click on ‘Downloads’. New customers create an account as they place their order.
File | |
Pages | 1 |
File Size (MB) | 0.7 |